Skip to content

Closed Proposals

Details of proposals that the Panel has previously considered, including its recommendation to Ofwat, can be found below. As these proposals are closed, we are no longer accepting comments on them.

Closed Proposals

Closed Proposal

Torrent Water Management change proposal – addition of the material HDPE for raising sections to DCG v2.1 E6.7 – Ofwat decision document

24 February 2025
Closed Proposal

Torrent Water Management change proposal – addition of the material HDPE for raising sections to DCG v2.1 E6.7 – letter from Panel to Ofwat

8 November 2024
Closed Proposal

Torrent Water Management change proposal – addition of the material HDPE for raising sections to DCG v2.1 E6.7 – change proposal form

30 August 2024
Closed Proposal

John Davidson Pipes Limited change proposal – Uniformity between E2.21 and E2.22 of DCG – Ofwat decision document

28 March 2024
Closed Proposal

John Davidson Pipes Limited change proposal – Uniformity between E2.21 and E2.22 of DCG – letter from Panel to Ofwat

19 January 2024
Closed Proposal

John Davidson Pipes Limited change proposal – Uniformity between E2.21 and E2.22 of DCG – report from Water Research Centre (WRc)

19 January 2024
Closed Proposal

Chris Faulkner change proposal – flow controls – Ofwat decision document

17 October 2023
Closed Proposal

John Davidson Pipes Limited change proposal – Uniformity between E2.21 and E2.22 of DCG – change proposal form

22 September 2023
Closed Proposal

British Plastics Federation change proposal – Specifications for perforated pipes for infiltration trenches and filter drains – Ofwat Decision Document

6 September 2023
Closed Proposal

Chris Faulkner change proposal – flow controls – letter from Panel to Ofwat 26.07.23

26 July 2023